Alaska Public Media, Defense One + 1 more
Opinion: It is unacceptable to renew the trans-Alaska pipeline system lease 7 years early
Catherine Rocchi and Brian Kassof contend that renewing TAPS leases more than seven years early would leave long-term owner finances and decommissioning obligations inadequately addressed. They cite an EIA forecast that throughput will reach the owners’ stated 300,000-barrel-per-day minimum by 2050, within the proposed lease period.
Q2 maps 28-year lithium operation at Cisco
Q2 Metals’ first preliminary economic assessment estimates $2.93 billion in initial capital for a proposed open-pit operation at its Cisco project in Quebec. The study projects annual output of 1.7 million tonnes of spodumene concentrate over 28 years, but relies entirely on inferred resources.
Arctic shipping expands as Chinese and Korean transit ambitions collide with chilly realities
September brought container-route tests on the Northern Sea Route alongside shipments of equipment for Arctic LNG 2 and the start of commercial Vostok Oil shipments. Container voyages encountered delays and weak cargo demand; the LNG modules’ delivery and installation were not confirmed.
Greenland moves to pause giving out licenses for deep-sea mining until 2029
Greenland’s parliament passed a proposal directing the government to draft legislation suspending seabed-mining licenses through December 2029. The government could extend the suspension in two-year increments; the parliamentary statement cited limited scientific knowledge about environmental impacts.
Legislative assembly briefs: Airport improvements advance in Rankin Inlet and Arviat
Nunavut ministers and the premier provided updates on airport construction, marine infrastructure, the proposed Kivalliq Hydro-Fibre Link and Elders’ mobility vans. Arviat’s terminal could go to tender this winter, while the vans remain delayed amid vacant secretariat positions.
Equinor refers questions on drilling in the Arctic despite EU resistance to Norwegian authorities
Equinor refers questions on drilling in the Arctic to Norwegian authorities despite EU resistance.
Penticton Herald, CA + 16 more
Canada reviews Western Arctic oil and gas moratorium; no decision to lift it
Agnico spends early to curb mine cost blowouts
Agnico CEO Ammar Al-Joundi says the company aims to complete 60% to 70% of detailed engineering before approving construction. At Hope Bay in Nunavut, engineering was about 76% complete and construction about 13% complete by the end of September; first gold production is targeted for 2030.
Five years after a beer, the Arctic's London pitch draws a PM & record attendance
More than 400 people attended the fifth annual Arctic Investments Conference in London, its largest audience yet. Iceland’s prime minister outlined her government’s investment and energy agenda, while speakers from across the Arctic discussed infrastructure, investment conditions and security.
Russia Takes Control of Two Chinese Heavy-Lift Ships Used for Arctic LNG 2 Deliveries
Bright and Glory, which have transported modules for Arctic LNG 2, reappeared near Murmansk under Russian flags after ownership and management changes to Eco Shipping LLC. Their September delivery voyage included an AIS-dark passage, and their future deployment remains unclear.
Technological Sovereignty of the Oil and Gas Complex in the Arctic
Alexey Fadeev, Konstantin Zaikov, and co-authors examine Russian strategies for technological sovereignty in the Arctic fuel and energy sector from 2014 to 2026. Their analysis covers digitalization and import-substitution cases at energy companies operating in the region.
Kongsberg Maritime Secures Contract for Equinor's Wisting Field Development
Kongsberg Maritime will provide the Safety and Automation System for Equinor’s Wisting FPSO and support front-end engineering and design. Further systems and services are conditional on the project proceeding to execution.
Kotzebue Electric Association shows us how to deliver affordable, resilient and stable power to isolated energy grids
Gene Therriault argues that isolated rural Alaska grids should use dependable local resources to provide affordable, resilient power. He cites KEA’s fuel costs: roughly half its fuel this year is priced at $4.87 per gallon, up from $3.33 last year, while the rest will be priced when the barge arrives.
High Arctic Geothermal Potential Reassessed for Resolute Bay
A study estimates Resolute Bay’s geothermal gradient at about 14.9°C per kilometer, revising earlier higher estimates that researchers link to permafrost drilling conditions and post-glacial effects. It finds electricity generation infeasible with current technology, while direct geothermal heat use may remain an option.
How the Iran War Is Making Alaskans Both Richer and Poorer
Oil prices have surged across the United States amid the ongoing war in Iran, raising household costs in most states. Alaska’s state government is bringing in new revenue from the state’s high oil production to offset those costs.
Thecooldown + Yahoo
Groups challenge Arctic Refuge leasing over seismic exploration risks
Alaska Public Media, Fairbanks Daily News-Miner + 4 more
AIDEA’s Arctic refuge seismic plans await federal permission
Canadian Uranium eyes acquisitions as Rook II exploration takes shape
Canadian Uranium is preparing to reassess historical mineralization at Rook II using modern exploration methods, with proposed drilling dependent on financing and other conditions. Adviser Arni Johannson says the company is also pursuing acquisitions and joint-venture opportunities.
Letter: Here’s how we help the state’s economic growth
Bennett Williams urges AIDEA to pursue a new Arctic drilling rig and fund a study comparing a road to Badami with wharf development. He says the study and drilling activity would help determine the preferred infrastructure option.
Protect The Western Arctic
The Bureau of Land Management is considering changes to oil drilling approvals across 23 million acres of Alaska’s Western Arctic. Protect Our Winters says the proposal would shorten review timelines and reduce environmental review and public input, and calls for comments by November 9.
Norway’s Oil and Gas Industry Faces a Major Decline Without New Discoveries
Rystad Energy projects Norwegian Continental Shelf production will fall 1.9 million barrels of oil equivalent per day short of its 2040 level in its base case. Three major operators plan around five high-impact wells a year for five years, while the government has offered 70 blocks in its APA licensing round.
Fairbanks Daily News-Miner, Anchorage Daily News + 1 more
Judge faults Army Corps approval of gold-dredging permit near Nome
The Barents Observer + ArcticToday
Researchers and environmental groups raise concerns over Equinor’s Wisting plans
Putin Decree Hides the Paper Trail of Russian Energy Exports as Arctic Traffic Sets Records
A Russian decree restricts disclosure of specified energy-export and shipping records, while not explicitly requiring vessels to hide their positions. CHNL counted 104 confirmed Northern Sea Route transits by 30 September and estimated 3.7 million tonnes of transit cargo; its higher season projections remain provisional.





